{"id":169849,"date":"2026-07-03T09:25:53","date_gmt":"2026-07-03T07:25:53","guid":{"rendered":"https:\/\/www.cde.ual.es\/?p=169849"},"modified":"2026-07-03T09:28:51","modified_gmt":"2026-07-03T07:28:51","slug":"union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal","status":"publish","type":"post","link":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/","title":{"rendered":"Energy Union: New Spain-Portugal power interconnector inaugurated"},"content":{"rendered":"<p style=\"text-align: justify;\"><span dir=\"auto\">On 2 July, the European Commission celebrated the inauguration of the electricity interconnector between Spain and Portugal. The commissioning of this new infrastructure project linking northern Portugal and Galicia, in north-western Spain, marks a key milestone in the energy sector<\/span><strong><span dir=\"auto\">.<\/span><\/strong><span dir=\"auto\">\u00a0The project increases cross-border electricity transmission capacity by 1,000 MW, bringing the total to 4,200 MW from Spain to Portugal and 3,500 MW from Portugal to Spain.<\/span><\/p>\n<p style=\"text-align: justify;\"><img decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/www.cde.ual.es\/wp-content\/uploads\/2026\/07\/istockphoto-1092845364-612x612-1.jpg\" \/><\/p>\n<p style=\"text-align: justify;\"><span dir=\"auto\">The interconnector represents a significant boost for both systems, increasing efficiency and facilitating the integration of more renewable energy \u2013 estimated at an additional 281 GWh per year \u2013 with a consequent reduction in CO\u2082 emissions of 113,000 tonnes annually. This project, carried out by the transmission system operators (TSOs)<\/span><em><span dir=\"auto\">Red El\u00e9ctrica<\/span><\/em><span dir=\"auto\">in Spain<\/span><span dir=\"auto\">and<\/span><em><span dir=\"auto\">REN<\/span><\/em><span dir=\"auto\">in Portugal<\/span><span dir=\"auto\">, will boost energy independence in both countries and contribute to the completion of the Energy Union. This milestone underlines the importance of coordinated EU action, in particular through the High-Level Group on Interconnections in South-West Europe (HLG-SWE), and represents a further step towards achieving the EU\u2019s target of 15 per cent electricity interconnection by 2030.<\/span><\/p>\n<p style=\"text-align: justify;\"><span dir=\"auto\">The EU Commissioner for Energy and Housing, Dan J\u00f8rgensen, said<\/span><\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><em><span dir=\"auto\">\u201cI wholeheartedly welcome the inauguration of this key energy link between Spain and Portugal. Cross-border electricity interconnections are essential for integrating more renewable energy into our system and, consequently, reducing energy prices. A stronger European Union must be based on a robust internal electricity market.\u201d<\/span><\/em><\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\"><span dir=\"auto\">Cross-border interconnections are essential for strengthening the resilience of the electricity system, improving competitiveness by reducing electricity prices, and facilitating the large-scale integration of renewable energy across all Member States. The project has received support from the European Commission through its inclusion on the EU\u2019s list of Projects of Common Interest (PCI) and within the framework of the High-Level Group on Interconnections in South-West Europe.<\/span><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><strong>More information: <a href=\"https:\/\/energy.ec.europa.eu\/news\/energy-union-new-spain-portugal-electricity-interconnection-inaugurated-2026-07-02_en\">European Commission<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 2 July, the European Commission celebrated the inauguration of the electricity interconnector between Spain and Portugal. The commissioning of this new infrastructure project linking northern Portugal and Galicia, in north-western Spain, marks a key milestone in the energy sector.\u00a0The project increases cross-border electricity transmission capacity by 1,000 MW, bringing the total to 4,200 MW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":169843,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","footnotes":""},"categories":[346,4064,4065],"tags":[15039,7173,623,792,13503,13073,1488,368,2788,4567,2285,1115,806,351],"class_list":["post-169849","post","type-post","status-publish","format-standard","has-post-thumbnail","category-eu-news","category-institutional","category-international-pol-coop","tag-actualidad-en","tag-comision-europea-en-2","tag-cooperation","tag-electricity","tag-energy-union","tag-espana-en-2","tag-european-commission","tag-european-union","tag-news","tag-noticias-en","tag-portugal","tag-renewable-energy","tag-spain","tag-union-europea-en","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Energy Union: New Spain-Portugal power interconnector inaugurated | CDE Almer\u00eda - Centro de Documentaci\u00f3n Europea - Universidad de Almer\u00eda<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Energy Union: New Spain-Portugal power interconnector inaugurated | CDE Almer\u00eda - Centro de Documentaci\u00f3n Europea - Universidad de Almer\u00eda\" \/>\n<meta property=\"og:description\" content=\"On 2 July, the European Commission celebrated the inauguration of the electricity interconnector between Spain and Portugal. The commissioning of this new infrastructure project linking northern Portugal and Galicia, in north-western Spain, marks a key milestone in the energy sector.\u00a0The project increases cross-border electricity transmission capacity by 1,000 MW, bringing the total to 4,200 MW [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/\" \/>\n<meta property=\"og:site_name\" content=\"CDE Almer\u00eda - Centro de Documentaci\u00f3n Europea - Universidad de Almer\u00eda\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/cdeuniversidadalmeria\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-03T07:25:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-03T07:28:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cde.ual.es\/wp-content\/uploads\/2026\/07\/istockphoto-1092845364-612x612-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"612\" \/>\n\t<meta property=\"og:image:height\" content=\"343\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"AdminCDE\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@cdeualmeria\" \/>\n<meta name=\"twitter:site\" content=\"@cdeualmeria\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"AdminCDE\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/\"},\"author\":{\"name\":\"AdminCDE\",\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/#\\\/schema\\\/person\\\/13895e824f15237b9d9b0152b5f65d80\"},\"headline\":\"Energy Union: New Spain-Portugal power interconnector inaugurated\",\"datePublished\":\"2026-07-03T07:25:53+00:00\",\"dateModified\":\"2026-07-03T07:28:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/\"},\"wordCount\":305,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.cde.ual.es\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/istockphoto-1092845364-612x612-1.jpg\",\"keywords\":[\"actualidad\",\"Comision Europea\",\"Cooperation\",\"Electricity\",\"Energy Union\",\"Espa\u00f1a\",\"European Commission\",\"European Union\",\"News\",\"noticias\",\"Portugal\",\"renewable energy\",\"Spain\",\"Uni\u00f3n Europea\"],\"articleSection\":[\"EU News\",\"Institutional Affairs\",\"International Politics and Cooperation\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/\",\"url\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/\",\"name\":\"Energy Union: New Spain-Portugal power interconnector inaugurated | CDE Almer\u00eda - Centro de Documentaci\u00f3n Europea - Universidad de Almer\u00eda\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.cde.ual.es\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/istockphoto-1092845364-612x612-1.jpg\",\"datePublished\":\"2026-07-03T07:25:53+00:00\",\"dateModified\":\"2026-07-03T07:28:51+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.cde.ual.es\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/istockphoto-1092845364-612x612-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.cde.ual.es\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/istockphoto-1092845364-612x612-1.jpg\",\"width\":612,\"height\":343,\"caption\":\"Portugal and Spain flag together realtions textile cloth fabric texture\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.cde.ual.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Noticias UE\",\"item\":\"https:\\\/\\\/www.cde.ual.es\\\/category\\\/noticias-ue\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Asuntos Institucionales\",\"item\":\"https:\\\/\\\/www.cde.ual.es\\\/category\\\/noticias-ue\\\/institucionales\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Cooperaci\u00f3n y Pol\u00edtica Exterior\",\"item\":\"https:\\\/\\\/www.cde.ual.es\\\/category\\\/noticias-ue\\\/institucionales\\\/coop-pol-ext\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Energy Union: New Spain-Portugal power interconnector inaugurated\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/#website\",\"url\":\"https:\\\/\\\/www.cde.ual.es\\\/\",\"name\":\"CDE Almer\u00eda - Centro de Documentaci\u00f3n Europea - Universidad de Almer\u00eda\",\"description\":\"Centro de Documentaci\u00f3n Europea de la Universidad de Almer\u00eda\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/#organization\"},\"alternateName\":\"CDE Almer\u00eda\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.cde.ual.es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/#organization\",\"name\":\"Centro de Documentaci\u00f3n Europea de Almer\u00eda\",\"url\":\"https:\\\/\\\/www.cde.ual.es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.cde.ual.es\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/cde-logo-3.png\",\"contentUrl\":\"https:\\\/\\\/www.cde.ual.es\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/cde-logo-3.png\",\"width\":1400,\"height\":300,\"caption\":\"Centro de Documentaci\u00f3n Europea de Almer\u00eda\"},\"image\":{\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/cdeuniversidadalmeria\\\/\",\"https:\\\/\\\/x.com\\\/cdeualmeria\",\"https:\\\/\\\/www.tiktok.com\\\/@cdealmeria\",\"https:\\\/\\\/www.instagram.com\\\/cdealmeria\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/cde-almera-812b26a9\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.cde.ual.es\\\/#\\\/schema\\\/person\\\/13895e824f15237b9d9b0152b5f65d80\",\"name\":\"AdminCDE\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a72d038d371f995cd13706fac32274b7952a52e8fb0a84b5f80c85426f2a98a8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a72d038d371f995cd13706fac32274b7952a52e8fb0a84b5f80c85426f2a98a8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a72d038d371f995cd13706fac32274b7952a52e8fb0a84b5f80c85426f2a98a8?s=96&d=mm&r=g\",\"caption\":\"AdminCDE\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Energy Union: New Spain-Portugal power interconnector inaugurated | CDE Almer\u00eda - Centro de Documentaci\u00f3n Europea - Universidad de Almer\u00eda","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/","og_locale":"en_US","og_type":"article","og_title":"Energy Union: New Spain-Portugal power interconnector inaugurated | CDE Almer\u00eda - Centro de Documentaci\u00f3n Europea - Universidad de Almer\u00eda","og_description":"On 2 July, the European Commission celebrated the inauguration of the electricity interconnector between Spain and Portugal. The commissioning of this new infrastructure project linking northern Portugal and Galicia, in north-western Spain, marks a key milestone in the energy sector.\u00a0The project increases cross-border electricity transmission capacity by 1,000 MW, bringing the total to 4,200 MW [&hellip;]","og_url":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/","og_site_name":"CDE Almer\u00eda - Centro de Documentaci\u00f3n Europea - Universidad de Almer\u00eda","article_publisher":"https:\/\/www.facebook.com\/cdeuniversidadalmeria\/","article_published_time":"2026-07-03T07:25:53+00:00","article_modified_time":"2026-07-03T07:28:51+00:00","og_image":[{"width":612,"height":343,"url":"https:\/\/www.cde.ual.es\/wp-content\/uploads\/2026\/07\/istockphoto-1092845364-612x612-1.jpg","type":"image\/jpeg"}],"author":"AdminCDE","twitter_card":"summary_large_image","twitter_creator":"@cdeualmeria","twitter_site":"@cdeualmeria","twitter_misc":{"Written by":"AdminCDE","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/#article","isPartOf":{"@id":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/"},"author":{"name":"AdminCDE","@id":"https:\/\/www.cde.ual.es\/#\/schema\/person\/13895e824f15237b9d9b0152b5f65d80"},"headline":"Energy Union: New Spain-Portugal power interconnector inaugurated","datePublished":"2026-07-03T07:25:53+00:00","dateModified":"2026-07-03T07:28:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/"},"wordCount":305,"commentCount":0,"publisher":{"@id":"https:\/\/www.cde.ual.es\/#organization"},"image":{"@id":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.cde.ual.es\/wp-content\/uploads\/2026\/07\/istockphoto-1092845364-612x612-1.jpg","keywords":["actualidad","Comision Europea","Cooperation","Electricity","Energy Union","Espa\u00f1a","European Commission","European Union","News","noticias","Portugal","renewable energy","Spain","Uni\u00f3n Europea"],"articleSection":["EU News","Institutional Affairs","International Politics and Cooperation"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/","url":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/","name":"Energy Union: New Spain-Portugal power interconnector inaugurated | CDE Almer\u00eda - Centro de Documentaci\u00f3n Europea - Universidad de Almer\u00eda","isPartOf":{"@id":"https:\/\/www.cde.ual.es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/#primaryimage"},"image":{"@id":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.cde.ual.es\/wp-content\/uploads\/2026\/07\/istockphoto-1092845364-612x612-1.jpg","datePublished":"2026-07-03T07:25:53+00:00","dateModified":"2026-07-03T07:28:51+00:00","breadcrumb":{"@id":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/#primaryimage","url":"https:\/\/www.cde.ual.es\/wp-content\/uploads\/2026\/07\/istockphoto-1092845364-612x612-1.jpg","contentUrl":"https:\/\/www.cde.ual.es\/wp-content\/uploads\/2026\/07\/istockphoto-1092845364-612x612-1.jpg","width":612,"height":343,"caption":"Portugal and Spain flag together realtions textile cloth fabric texture"},{"@type":"BreadcrumbList","@id":"https:\/\/www.cde.ual.es\/en\/union-energetica-se-inaugura-la-nueva-interconexion-electrica-espana-portugal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inicio","item":"https:\/\/www.cde.ual.es\/en\/"},{"@type":"ListItem","position":2,"name":"Noticias UE","item":"https:\/\/www.cde.ual.es\/category\/noticias-ue\/"},{"@type":"ListItem","position":3,"name":"Asuntos Institucionales","item":"https:\/\/www.cde.ual.es\/category\/noticias-ue\/institucionales\/"},{"@type":"ListItem","position":4,"name":"Cooperaci\u00f3n y Pol\u00edtica Exterior","item":"https:\/\/www.cde.ual.es\/category\/noticias-ue\/institucionales\/coop-pol-ext\/"},{"@type":"ListItem","position":5,"name":"Energy Union: New Spain-Portugal power interconnector inaugurated"}]},{"@type":"WebSite","@id":"https:\/\/www.cde.ual.es\/#website","url":"https:\/\/www.cde.ual.es\/","name":"CDE Almer\u00eda - Centro de Documentaci\u00f3n Europea - Universidad de Almer\u00eda","description":"Centro de Documentaci\u00f3n Europea de la Universidad de Almer\u00eda","publisher":{"@id":"https:\/\/www.cde.ual.es\/#organization"},"alternateName":"CDE Almer\u00eda","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cde.ual.es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.cde.ual.es\/#organization","name":"Centro de Documentaci\u00f3n Europea de Almer\u00eda","url":"https:\/\/www.cde.ual.es\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.cde.ual.es\/#\/schema\/logo\/image\/","url":"https:\/\/www.cde.ual.es\/wp-content\/uploads\/2025\/07\/cde-logo-3.png","contentUrl":"https:\/\/www.cde.ual.es\/wp-content\/uploads\/2025\/07\/cde-logo-3.png","width":1400,"height":300,"caption":"Centro de Documentaci\u00f3n Europea de Almer\u00eda"},"image":{"@id":"https:\/\/www.cde.ual.es\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/cdeuniversidadalmeria\/","https:\/\/x.com\/cdeualmeria","https:\/\/www.tiktok.com\/@cdealmeria","https:\/\/www.instagram.com\/cdealmeria\/","https:\/\/www.linkedin.com\/in\/cde-almera-812b26a9\/"]},{"@type":"Person","@id":"https:\/\/www.cde.ual.es\/#\/schema\/person\/13895e824f15237b9d9b0152b5f65d80","name":"AdminCDE","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/a72d038d371f995cd13706fac32274b7952a52e8fb0a84b5f80c85426f2a98a8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a72d038d371f995cd13706fac32274b7952a52e8fb0a84b5f80c85426f2a98a8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a72d038d371f995cd13706fac32274b7952a52e8fb0a84b5f80c85426f2a98a8?s=96&d=mm&r=g","caption":"AdminCDE"}}]}},"_links":{"self":[{"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/posts\/169849","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/comments?post=169849"}],"version-history":[{"count":5,"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/posts\/169849\/revisions"}],"predecessor-version":[{"id":169856,"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/posts\/169849\/revisions\/169856"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/media\/169843"}],"wp:attachment":[{"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/media?parent=169849"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/categories?post=169849"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cde.ual.es\/en\/wp-json\/wp\/v2\/tags?post=169849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}